Resource Groups sum the availability and capacity of its resources
A report divided by resource group and I would like to be able to see the scheduled time in unassigned which is where we put all the work that needs to be done by the specific team.
Also have the availability and the capacity of the group but that in the “Unassigned” group we could be able to see the sum of all the hours of the resources of the group. That way we are able to see the availability of all the people that work in this group and to see if we can schedule time (that is placed in "unassigned") with them based on their capacity and availability.
3
votes
Isabel
shared this idea