Skip to content

What's Next for Hub Planner?

Below you can help shape the functionality of Hub Planner by suggesting your idea. We want to make sure we are listening to the users of Hub Planner and incorporating your Feedback within our Project Roadmap.

372 results found

  1. Export data to Microsoft Power BI or Tableau for reporting

    It would be good if HubPlanner could automatically feed standard reporting tools like Tableau or Power BI

    21 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Possibility to configure the role names

    We would like to be able to configure the name of the roles. Account handler does not make sense in our business, where a person with that role is 'Project Manager' or 'Delivery Manager' and a team member is a 'consultant' etc.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. External Rate- Enter a Whole Cost

    My team would like to include a whole cost for the external rate.
    So instead of showing External Rate at 150$ per hour. It will be one lump sum of $2500.
    When we outsource a portion of a project we are billed a lump sum, not an hourly rate, and in order to catch it up to the active budget, we need to enter the whole cost in to the project.

    This would really help out!

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Visibility to when/who has created/updated a new project, event and resource

    Currently it is possible to view who has created/updated a booking and when. I would like to see similar functionality for a project, event and resource.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Improve the user interface

    clean up the User Interface. Remove redundant buttons and bars that clutter the screen, obscuring the scheduler and streamline the border widths and heights.

    The bars and functions take up to much space, so that on a 1366 x 768 screen the actual scheduler data is less than 40% of the screen contents.

    There is really no need for the month, weeknumber and day number to be 30px high if my projects are only 17px

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Microsoft Flow Connector

    Alongside the Zapier connector, create a Microsoft Flow connector.

    12 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Rate card per client

    I would like to see rate cards based on client. Each client would have resources assigned to it. We could then set individual rate cards based on the client rate card. Then, all projects that are assigned that client would be already setup with the correct rate card. At the moment we have to setup each project individually which isn't workable for us as we have hundreds of projects.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Ability to enter custom work hours in the wand menu like 7:30

    Just add a custom input so you can define your hours in the wand that applies working hours for multiple days.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Ability to enter custom work hours in the wand menu like 7:30

    Just add a custom input so you can define your hours in the wand that applies working hours for multiple days.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. Custom fields in scheduler context drop-down menu

    Option to have custom fields show up on the scheduler selection context menu so one could easily choose custom field options to apply to the booking selection. Similar to the Booking Category selection option that already exists. This would allow us to customize the booking selection based on our custom fields.

    18 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Option to display milestone text on timeline

    We would like to have an option to display the test of a milestone next to the dot. For instance, if the milestone is "RFP Due" that would be shown next to the dot in the gantt view. The dots are not translating to teams looking at the overall schedules. There is no context so not providing information unless you hover

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Share Group Resourcing with Resource Manager

    I would love to see a way to automatically send reports at whatever cadence we think works straight from the system to a resource manager. And/or send a link directly a department head. Currently the view of a group is the most valuable visual for resource managers and we have no way to share with them. Sending a PDF is not maximizing the value of the tool, and I'd like to see managers in the tool.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Remove UI elements relating to extensions that haven't been purchased.

    The UI is cluttered with extensions that we haven't puchased, which makes it harder for users, and leads to confusions (for example, "what Timesheets tool should we use now?"). Simple UI is so important to usability that this should outlay any benefits that come from sell-through as a result of people demanding these features.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. hours displayed - booked vs free

    Would like to see the hours booked instead of seeing the free hours when we look at a group of ressources?

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. Timesheet actual values on scheduler with planned numbers

    It would be great to have the scheduler that could display the Timesheet actual values with the scheduled hours. We have the bar and numbers on but would like to include the timesheet actuals.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. project request

    Extension for project request submissions through an interface for customers to request project work. This creates the project and notifies the team of a new project request so it can be assigned to a resource and additional details to be filled out or even rejected.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. Schedule automatic creation of reports

    In the previous CRM we used we could "schedule" the automatic creation of reports. For example, on the 1st of the month run a specific report and email the results to desired people. It would be nice to have that.

    20 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. hover

    When in week view, I would like to see the days that a project is scheduled in the hover. The Created Date and Updated Date are not useful.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. Saved view of timesheets - booking category

    Hi- Our team would LOVE to see a way to save timesheet views week over week including typical projects AND booking categories. Right now we can do a work around to save a project view, however booking categories default. This used to be available in our previous time tracking system and saved a lot of time.

    15 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. column width - hours scale

    In the scheduler view, hour scale, there is an option for width with some predefined settings. The setting of 10 is to compact for my liking and the setting of 40 is too wide so a whole day doesn't appear on one screen when set to 30 minute interval. Can we have some additional width options or ability to type in our own value.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
1 2 8 10 12 18 19
  • Don't see your idea?

What's Next for Hub Planner?

Categories

Feedback and Knowledge Base