What's Next for Hub Planner?

Below you can help shape the functionality of Hub Planner by suggesting your idea. We want to make sure we are listening to the users of Hub Planner and incorporating your Feedback within our Project Roadmap.

  1. Add Outlook style contact list as common reference tool for team communications.

    Almost every project we create involves outside vendors and consultants. Each project has a unique contact list that are an integral part of the team. A team member should be able to add Hub project contacts for team reference and contact. A user should be able to initiate emails from the project contact list and the email should be recorded and archived in the project available to all team members.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  2. Show usage/capacity as % of week used. As visual fill-up bar.

    usage vs capacit shown as % of time per week.
    Preferably as a visual fill-up of available time for each week.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  3. column width - hours scale

    In the scheduler view, hour scale, there is an option for width with some predefined settings. The setting of 10 is to compact for my liking and the setting of 40 is too wide so a whole day doesn't appear on one screen when set to 30 minute interval. Can we have some additional width options or ability to type in our own value.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  4. milestone

    Milestones for a given project do not show up on the same line/level in the project and ressources view, instead they are spread out wherever there is place for them in the project row. Would be great to have them located all at the top for one given project.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  5. Missing Report Label

    After selecting your report from the menu on the left and selecting the date range to view, the Report Title should be displayed at the top of the page, but it just says "Report".

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  6. Have the side bar in standard alphabetical order, so that eA, comes before En.

    Have the side bar in standard alphabetical order, so that eA, comes before En.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  7. Hide iOS Safari browser UI/Chrome

    I like to open the site on my iPad, but the browser UI/chrome takes up too much real estate. Including the following tag would solve this problem :)

    <meta name="apple-mobile-web-app-capable" content="yes">

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  8. Disbursements Claim extension

    Claims module that can be linked to resources on all projects.

    0 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  9. KM

    Let the worker add distanse (km) pr day pr project in My Timesheet

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  10. Add booking categories field to columns in reports

    You can filter or group by booking category but you cannot run a report and add a column that shows the booking category.

    0 votes
    Vote
    Sign in
    (thinking…)
    Sign in with: Facebook Google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Flag idea as inappropriate…  ·  Admin →
1 2 13 14 15 17 Next →
  • Don't see your idea?

What's Next for Hub Planner?

Categories

Feedback and Knowledge Base