Below you can help shape the functionality of Hub Planner by suggesting your idea. We want to make sure we are listening to the users of Hub Planner and incorporating your Feedback within our Project Roadmap.

369 results found

  1. Bulk delete schedulling

    Bulk delete the scheduled out time on a resources timeline, with a warning/alert asking, "Are you sure you want to do this."

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Showing tasks in reports

    Generate a report for task assigned/completed.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. date format

    Data exports date formats need to be configurable.
    Currently data exports have dates in the format mm/dd/yyyy hh:mm. This is no good for users that use the format dd/mm. Opening the current exports in excel results in some dates being misinterpreted and others as being seen as non-date entries.
    2 options: either make date formats configurable, or set a non-ambiguous date format in the export (international guidelines exist for this).

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. subproject

    It would be helpful to have the possibility to schedule subprojects with different subproject code belonging to a project with a unique project code .

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Unassigned work is counting as having capacity

    The unassigned work feature enables buckets that you can place hours into for work that is unassigned. This is a very useful feature for forecasting work. However, when we include the forecasted, unassigned work in utilization reports, the UW bucket has capacity and skews the utilization for the resource group, giving us lower than actual utilization numbers. The UW buckets should have 0 utilization across the board since they are not an actual resource.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Automatically change end date month to match start day month

    Currently, if it is January, and I want to book for July, I set the start day to July, but then I also have to scroll through the end date to July or later as well. It would be nice if the end date would automatically change the selection to the month of the start date before final selection. Obviously, I can't start a booking and end it before it starts. This would save a lot of time - especially when booking over a year out.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Show not only budget hours on the schedular project view also show budget persondays

    Show not only budget hours on the schedular project view also show persondays

    If the timescale of the scheduler is in days, it would be very helpful if the times in the project dashboard are also displayed in days.
    In many companies in Germany, it is common for project budgets to be presented in person days (PT) and not in hours.

    An option could also be, that each user can individually adjust the unit via the gear in the top right corner

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Weekly Booking Summaries - add option to send out "next 4 weeks".

    Currently you can only send out the current week or the next week.

    We think it would be helpful to see the next 4 weeks. This would give us more lead time to catch mistakes and not have to adjust so urgently.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Search Settings function

    To have the ability to search through the settings. As owner, there are a lot of settings to trawl through and have a search function would make this easier to navigate through

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. do not duplicate categories on a project when copying a past week

    When you're scheduled for a project and copy the previous week's timesheet, your project for the current week will have duplicate categories for the current week's project and also for the previous week, resulting in 2 lines per project that you're scheduled for. I'd like to see the duplicated project excluded.

    example: I'm scheduled to work 1 hour a day, every work day on project b, but also work on projects I'm not specifically scheduled for. When I copy my previous week's time sheet to save from having to replicate the additional projects, the project b for this week now…

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Resource Groups sum the availability and capacity of its resources

    A report divided by resource group and I would like to be able to see the scheduled time in unassigned which is where we put all the work that needs to be done by the specific team.
    Also have the availability and the capacity of the group but that in the “Unassigned” group we could be able to see the sum of all the hours of the resources of the group. That way we are able to see the availability of all the people that work in this group and to see if we can schedule time (that is placed…

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. holidays project

    Public holidays to show on project view as well as resources view.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Filter Manage Employees and Manage Projects lists by Active or provide default filter setting

    I would like to see only active records in the Manage Employees and Manage Projects sections as I am getting all the archived records shuffled with active records and have to scroll or filter every time I go to the page.

    Having 10 active projects I have to also deal with over 70 archived and select the relevant data every time I open the page.

    Of course this may affect other people so better solution would be to provide a kind of "default filter" setting per user for those sections so that every user could set it up as appropriate.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Currency information in Billing & Forcasting reports export

    We have external rates in multiple currencies, when report is exported in XLS/CSV no information on currency is available.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. improved timeline export

    Would like to export the timeline for a whole project, not just what's visible on the screen - and also in an editable format, such as AI or PDF. This way we wouldn't have to duplicate in another program to be able to send a basic version to a client for agreement.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Tool Tip Customization

    Ability to customize info that shows in Booking Tool Tip such as custom fields, client, etc.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. External Rate- Enter a Whole Cost

    My team would like to include a whole cost for the external rate.
    So instead of showing External Rate at 150$ per hour. It will be one lump sum of $2500.
    When we outsource a portion of a project we are billed a lump sum, not an hourly rate, and in order to catch it up to the active budget, we need to enter the whole cost in to the project.

    This would really help out!

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Improve the user interface

    clean up the User Interface. Remove redundant buttons and bars that clutter the screen, obscuring the scheduler and streamline the border widths and heights.

    The bars and functions take up to much space, so that on a 1366 x 768 screen the actual scheduler data is less than 40% of the screen contents.

    There is really no need for the month, weeknumber and day number to be 30px high if my projects are only 17px

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. Option to display milestone text on timeline

    We would like to have an option to display the test of a milestone next to the dot. For instance, if the milestone is "RFP Due" that would be shown next to the dot in the gantt view. The dots are not translating to teams looking at the overall schedules. There is no context so not providing information unless you hover

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. 24 Bookings calendar with 8 hrs capped availability

    We would like to be able to cap availability at 8hrs but be able to book resources within a 24 hr period and cap. Currently if we change the working day to 24 hrs then the resource shows with 24 hrs availability and not 8 hrs. We also want to be able to exclude weekends from availability but book resources in when required.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
1 2 5 7 9 18 19
  • Don't see your idea?

What's Next for Hub Planner?

Categories

Feedback and Knowledge Base